LBW has been renting office space at Englerallee 19, 14195 Berlin, Haus Bredow since November 1st, 2019. The new premises will allow LBW to expand further in the coming years. The new rooms are within walking distance to the research …
IVU Traffic Technologies AG takes over 100% of LBW
View PostMartin Grötschel receives DMV Cantor Medal
View PostLBW implements network control optimizer for Open Grid Europe GmbH
View PostUsergroup Optimization Meets at Transdev in Husum
The usergroup optimization convened for this year’s second annual meeting on 2018, September 27/28 in Husum, hosted by transdev Maintenance GmbH. The 19 participants from Germany, Luxemburg, Norway, and Switzerland discussed a wide variety of topics including usability, idle turns, …
LBW @ Research Campus MODAL
The research campus MODAL held its 4th general assembly at the premises of Zuse Institute Berlin. LBW participates in the RailLab of MODAL with a project on the continued development of its rotation optimizer R-OPT. It aims at full parallelization …
mcf in SPEC CPU2017 Benchmarksuite
The Standard Performance Evaluation Corporation (SPEC) has released its new CPU, memory, and compiler benchmarks. For the third time in a row, a special version of the min-cost flow solver MCF for vehicle scheduling is part of the new suite, …